Stormwater project aims to supply enough water for 900 families a year

Stormwater project aims to supply enough water for 900 families a year

Beaumont-Cherry Valley Water District (BCVWD) and Riverside County Flood Control and Water Conservation District are collaborating to capture enough stormwater to supply up to 900 families a year, while minimizing flooding in a portion of Cherry Valley.

The Beaumont MDP Line 16 project will construct an underground storm drain that collects runoff and delivers up to 500 acre-feet of water a year to BCVWD’s existing recharge ponds, which feed the Beaumont groundwater basin. Without this joint effort, stormwater would continue to flow along Brookside Avenue, directly into Marshall Creek, and be lost downstream.

“The project area often experiences flooding with even just small amounts of rain,” said Vice President Andy Ramirez, on behalf of the Board of Directors. “By working together to manage and collect stormwater, we can minimize the flood impacts to our community and strategically grow our local water resources while promoting a sustainable water future.”

The stormwater project, funded by BCVWD, Riverside County Flood Control and Water Conservation District, and state grant money, is estimated to cost $7,558,650. Construction will begin March 2022 and is anticipated to be complete by June 2023.

For questions about the project, contact David Garcia, Construction Manager with the Riverside County Flood Control and Water Conservation District, at 951-955-1288.

Check Also

funding opportunity for agricultural water conservation

Metropolitan Helps Advance Local Water Supply Projects

Four new local water supply projects that will together produce enough water for 100,000 Southern …

Leave a Reply

Your email address will not be published. Required fields are marked *