The San Diego County Water Authority (SDCWA) will be shutting down the First Aqueduct periodically over the next four months for maintenance projects. The first of the three shutdowns, is set for December 5-14.
“Proactively managing our water delivery system in coordination with our member agencies ensures we continue to provide a safe and reliable supply that serves the region’s 3.3 million residents and our $240 billion economy,” said Eva Plajzer, the Water Authority’s director of operations and maintenance. “It requires an extraordinary amount of work each fall and winter during the shutdown season to take care of this critical infrastructure.”
The other scheduled shutdowns on the First Aqueduct are January 23 to February 1 and February 27 to March 8.
The First Aqueduct was constructed in the 1940s with Pipeline 1 and in the 1950s with Pipeline 2. On November 28, 1947, the first Colorado River water flowed south from Riverside County for 71 miles into the City of San Diego’s San Vicente Reservoir via the First Aqueduct.
As assets age, SDCWA proactively replaces and repairs them to minimize impacts to member agencies and the public. Investments in the latest inspection technologies, including electromagnetic scanning, robotic inspections and 3D tunnel inspections help the Water Authority’s asset management team detect defects in pipelines and related facilities. Identifying potential issues early avoids more costly fixes later.